PROCEDURE
1
Remove the protection cover (001,
) from all tie rods (002).
2
Clean the faces of the intermediate rings (004).
3
Do a check of the pre-tension of the first pair of tie rods a-a, refer to section
.
NOTE:
Start with the tie rods in the middle of the engine a-a, then b-b etc.
4
5
Apply a layer of Molykote paste G to the threads of the tie rods (002) to prevent
corrosion.
6
Attach the protection covers (001).
Fig 6-25
Pre-tension checks
CLOSE UP
•
None
X72DF
AA00-1903-00AAA-360A-A
Maintenance Manual
Tie rod - do a check of the pre-tension
Winterthur Gas & Diesel Ltd.
- 157 -
Issue 002 2020-10
Summary of Contents for X62DF
Page 881: ...Approved Tightening Instructions Rev I Page 1 14...
Page 882: ...Approved Tightening Instructions Rev I Page 2 14...
Page 883: ...Approved Tightening Instructions Rev I Page 3 14...
Page 884: ...Approved Tightening Instructions Rev I Page 4 14...
Page 885: ...Approved Tightening Instructions Rev I Page 5 14...
Page 886: ...Approved Tightening Instructions Rev I Page 6 14...
Page 887: ...Approved Tightening Instructions Rev I Page 7 14...
Page 888: ...Approved Tightening Instructions Rev I Page 8 14...
Page 889: ...Approved Tightening Instructions Rev I Page 9 14...
Page 890: ...Approved Tightening Instructions Rev I Page 10 14...
Page 891: ...Approved Tightening Instructions Rev I Page 11 14...
Page 892: ...Approved Tightening Instructions Rev I Page 12 14...
Page 893: ...Approved Tightening Instructions Rev I Page 13 14...
Page 894: ...Approved Tightening Instructions Rev I Page 14 14...