Electrical connection
5816,0013US / Version 02
53
8.4.6
Digital outputs and output relays
Technical data
See page 30, chapter 4.2.
NOTE!
The digital output functions can be freely
parameterised.
For output parameterisation, see
separate document "Description of control units
MGC and MGC Pro for MHTM
TM
MicroDrive
barriers".
Factory setting
Clamp
Description
Function
DO1
Digital output 1
Locking
DO2
Digital output 2
Impact detection
DO3
Digital output 3
Loop active A
DO4
Digital output 4
Loop active B
NO1
Relay
1
Open
NO2
Relay
2
Closed
NO3
Relay
3
Error
NO4/NC4 Relay
4
Boom angle 30
–
85°
NO5/NC5 Relay
5
Boom angle 60
–
85°
NO6/NC6
Relay 6
Service mode active
Table 9: Factory settings "Digital outputs" and "Relay outputs"
8.5
Checking the electrical connection
The following points have to be checked after the electrical
installation of the barrier:
Are the following electrical protective devices installed:
2-pole main switch, circuit breaker and ground fault circuit
interrupter?
Is the power cable connected to the terminal in compliance with
chapter 8.3?
Are the induction loops connected according to the wiring
diagram?
Are the control lines connected according to wiring diagram?
Are the safety plates in the area of the lever system
assembled?
Have all barrier housing covers been properly assembled?
Traffic H1 Swing Gate Horizontal Barrier
www.TURNSTILES.us | [email protected] | 303-670-1099