Assembly and installation
38
5816,0013US / Version 02
7.3.1
Foundation and empty conduits for the barrier
Assembly site
The assembly site must meet the following requirements:
The barrier must be visible from the operating person.
The barrier must not be put up where there is a danger of
flooding.
Keep a safety distance of at least 2 ft (610 mm) between the
barrier arm and objects such as walls, buildings, etc.
See page 26, chapter 2.7 and page 37, Fig. 8.
Foundation and reinforcement
The foundation must meet the following requirements:
See page page 37, Fig. 8 and page 39, Fig. 9.
Have sufficient load-carrying capacity.
(concrete foundations: C35/45 XD3 XF2)
Water cement value: 0.5
Foundation depth: at least 31.5 in (800 mm), frost-protected
foundation depth to be adjusted to the local situation.
Foundation section: 17.7 in x 23.6 in (450 mm x 600 mm)
Reinforcing mesh as shown in figure Fig. 10.
Surface has to be non-combustible material.
Empty conduits
The empty conduits must meet the following requirements:
See page 39, Fig. 9.
Separate empty conduits for mains cable and control line
Diameter: 1.14 ft (29 mm) each
Optional empty conduit for induction loop.
Diameter: 1.14 (29 mm) each
Conduits have to be planned to a sufficient length.
NOTE!
To provide a trouble-free operation use separate
conduits for control lines and mains cables.
Traffic H1 Swing Gate Horizontal Barrier