Thermo Fisher Scientific
Micro-Tech 9101/9201 Reference Manual, Rev J
2-1
Chapter 2
Initializing the Micro-Tech
This chapter tells you how to start up your Micro-Tech, initialize its
software, and get your Micro-Tech and its associated scale up and
running. As part of the initialization process you will perform a belt-
length test and, once this is done, do the initial zero and span calibrations
of the scale. Your Micro-Tech is then ready to go into operation.
There are five basic steps in the initialization process, as follows.
Determine the correct “belt-scale code” of the conveyor scale the
Micro-Tech is working with.
Acquire some basic conveyor and scale information—such as idler
spacing, conveyor angle, and so forth.
Determine the exact belt length of the conveyor.
Enter your belt-scale code and other conveyor and scale parameters
into the Micro-Tech to initialize the software.
Complete the initial scale (zero and span) calibrations.
Overview
Summary of Contents for Micro-Tech 9101
Page 1: ...Micro Tech 9101 9201 Integrator Reference Manual REC 4281 Rev J Part Number 127336 English...
Page 82: ......
Page 118: ......
Page 124: ...A 2 Micro Tech 9101 9201 Reference Manual Rev J Thermo Fisher Scientific...
Page 172: ......
Page 234: ......
Page 315: ......
Page 316: ......
Page 317: ......
Page 318: ......
Page 319: ......
Page 320: ......
Page 321: ......
Page 322: ......
Page 323: ......
Page 324: ......
Page 325: ......
Page 326: ......
Page 327: ......
Page 328: ......
Page 329: ......