DOCUMENT No.:
REVISION: 1.2
DATE: 2014/11/10
DC-MAM-001-X-C-2
Page 104
4.2.1.2
ELEVATOR REMOVAL / INSTALLATION
TOOLS / EQUIPMENT REQUIRED
ITEM
QUANTITY
NOTES
1
7/16 Spanner.
2
The above list is not necessarily a complete list of all required tools and equipment needed. A calibrated torque
wrench (with adequate range) and the correct size (as implied by the above tool list) accessories (sockets etc.)
are implied for torqueing bolts / nuts, if applicable. Refer to paragraph 1.5 for torque values.
CONSUMABLE MATERIAL REQUIRED
ITEM
QUANTITY
NOTES
1
Orange paint.
As needed.
The above list is not necessarily a complete list of all material needed. Refer to the Sling 4 construction manual.
AUTHORISED PERSONNEL
Any person performing maintenance of any kind on the aircraft or any component thereof must do so in
accordance with national legislation. This is the responsibility of the aircraft owner and any person who is to
perform any maintenance on the aircraft.
CAUTION
BE PREPARED WITH A HELPER OR SUPPORT STAND TO HANDLE THE WEIGHT
AND / OR AWKWARDNESS OF THE OBJECT TO BE REMOVED.
CAUTION
CONTROL SURFACE WILL ROTATE / FALL FREE WHEN THE CONTROL LINKAGE CONNECTED TO IT
IS DISCONNECTED.
Summary of Contents for Sling 4
Page 1: ......