DOCUMENT No.:
REVISION: 1.2
DATE: 2014/11/10
DC-MAM-001-X-C-2
Page 193
5.2.13 ENGINE REMOVAL / INSTALLATION
TOOLS / EQUIPMENT REQUIRED
ITEM
QUANTITY
NOTES
1
17 mm Spanner, 16 mm Spanner.
1 Each
2
Support stand for aircraft tail.
1
3
Calibrated torque wrench, with range of at least 40 to 45 Nm.
1
Installation only.
4
10 mm Spanner.
1
5
9 mm Spanner.
1
6
17 mm Socket.
1
To fit item 3.
7
Side cutter.
1
8
Locking pliers.
1
Installation only.
9
22 mm Spanner and 14 mm spanner.
1 Each
If oil reservoir not removed
with / attached to engine.
10 ½ inch Socket (with drive) and spanner.
1 Each
If engine mount to be
removed from firewall.
The above list is not necessarily a complete list of all required tools and equipment needed. A calibrated torque
wrench (with adequate range) and the correct size (as implied by the above tool list) accessories (sockets etc.)
are implied for torqueing bolts / nuts, if applicable. Refer to paragraph 1.5 for torque values.
CONSUMABLE MATERIAL REQUIRED
ITEM
QUANTITY
NOTES
1
Orange paint.
As needed.
2
Safety wire, Loctite 577, tie wraps.
As / if needed.
Loctite 577 for oil pipe fitting threads.
The above list is not necessarily a complete list of all material needed. Refer to the Sling 4 construction manual.
AUTHORISED PERSONNEL
Any person performing maintenance of any kind on the aircraft or any component thereof must do so in
accordance with national legislation. This is the responsibility of the aircraft owner and any person who is to
perform any maintenance on the aircraft.
WARNING
MASTER / IGNITION SWITCHES OFF.
WARNING
ALLOW THE ENGINE AND APPLICABLE COMPONENTS TO COOL COMPLETELY BEFORE
PERFORMING ANY WORK OR INSPECTION IN THE ENGINE COMPARTMENT. HOT ENGINE
COMPONENTS CAN CAUSE SERIOUS BURNS AND CAN IGNITE SPILLED FLUID / VAPOUR.
Summary of Contents for Sling 4
Page 1: ......