DOCUMENT No.:
REVISION: 1.2
DATE: 2014/11/10
DC-MAM-001-X-C-2
Page 171
4.4.2.5
NOSE GEAR REMOVAL / INSTALLATION
TOOLS / EQUIPMENT REQUIRED
ITEM
QUANTITY
NOTES
1
3/8 Spanner.
2
2
7/16 Spanner.
1
3
½ inch Spanner.
2
The above list is not necessarily a complete list of all required tools and equipment needed. A calibrated torque
wrench (with adequate range) and the correct size (as implied by the above tool list) accessories (sockets etc.)
are implied for torqueing bolts / nuts, if applicable. Refer to paragraph 1.5 for torque values.
AUTHORISED PERSONNEL
The above list is not necessarily a complete list of all required tools and equipment needed. A calibrated torque
wrench (with adequate range) and the correct size (as implied by the above tool list) accessories (sockets etc.)
are implied for torqueing bolts / nuts, if applicable. Refer to paragraph 1.5 for torque values.
CAUTION
BE PREPARED WITH A HELPER OR SUPPORT STAND TO HANDLE THE WEIGHT
AND / OR AWKWARDNESS OF THE OBJECT TO BE REMOVED / INSTALLED.
WARNING
MASTER / IGNITION SWITCHES OFF.
WARNING
ALLOW THE ENGINE AND APPLICABLE COMPONENTS TO COOL COMPLETELY BEFORE
PERFORMING ANY WORK OR INSPECTION IN THE ENGINE COMPARTMENT. HOT ENGINE
COMPONENTS CAN CAUSE SERIOUS BURNS AND CAN IGNITE SPILLED FLUID / VAPOUR.
Summary of Contents for Sling 4
Page 1: ......