TELELIFT 3713 SX
SCHEDULED MAINTENANCE INSPECTIONS
7
Document 57.4402.9200 - 1
st
Edition 10/2006
INDEX
.4 MAINTENANCE INSPECTION REPORT
Model
Serial number
Date
Hour meter
Machine owner
Inspected by
Inspector signature
Inspector title
Inspector company
Instructions:
- Make copies of this page to use for each
inspection.
- Select the appropriate checklist(s) for the
type of inspection to be performed.
Every 10 hours: A
Every 50 hours: A+B
Every 250 hours: A+B+C
Every 500 hours: A+B+C+D
Every 1000 hours: A+B+C+D+E
Every 2000 hours: A+B+C+D+E+F
At 6000 hours: G
- Place a check in the appropriate box
after each inspection procedure is
completed.
- Use the maintenance tables in this
section and the step-by-step procedures
in section 4 to learn how to perform
these inspection.
- If any inspection receives an “N”, tag
and remove the machine from service,
repair and re-inspect it. After repair,
place a check in the “R” box.
Legend:
Y = yes, acceptable
N = no, remove from service
R = repaired.
Table A
Y N R
Within the first 10 working hours:
A-1
Oil level within reduction gears,
power divider and differential
gears.
A-
Tightening of the wheel bolts.
A-
Tightening of all bolts and nuts.
A-4
Check the couplings for oil
leaks.
Every 10 working hours:
A-5
Operator Manual.
A-6
Decals and placards.
A-7
Engine oil level.
A-8
Air suction filter.
A-9
Radiator.
A-10
Hydraulic oil level in the tank.
A-11
Check the greasing of the boom
section pads.
A-1
Grase the forks.
A-1
Grease all joints of the boom,
the rear axle shaft joint, the
transmission shafts, the
front and rear axles and any
equipment of the machine.
A-14
Lighting electric system.
A-15
Efficiency of braking system
and parking brake.
A-16
Steering selection system.
A-17
Fork balancing system.
A-18
Safety devices.
A-19
Engine coolant level.
A-0
Overload warning system.
A-1
Check or re-sequence the
boom telescopes
Table B
Y N R
Within the first 50 working hours:
B-1
Change the engine oil and
renew the fuel filter.
Every 50 working hours:
B-
Alternator belt.
B-
Tyre inflation.
B-4
Tightening of the wheel nuts.
B-5
Tightening of the cardan shaft
screws.
B-6
Radiator fins.
Table C
Y N R
Every 250 working hours:
C-1
Engine oil and relevant filter.
C-
Oil level in the differential gears
and in the power divider.
C-
Oil level in the wheel reduction
gears.
C-4
Main filtering element of the
engine air filter.
C-5
Clamping of the cableheads to
the battery terminals.
C-6
Air suction hose between
engine and filter.
C-7
Cylinder chromium-plated
rods.
C-8
Hydraulic lines.
C-9
Check the electric cables do not
rub against the frame or other
mechanical components.
C-10
Wear of the sliding pads of the
boom sections.
C-11
Play of sliding pads.
C-1
Sliding parts of the boom
sections.
C-1
Level of the battery electrolyte.
C-14
Block valves.
Table D
Y N R
Every 500 workin
g hours
:
D-1
Smoke quantity evacuated from
the engine exhaust
.
D-
Tightening of the engine fixing
screws
.
D-
Tightening of the cab fixing
screws
.
D-4
Backlash between pins and
bushings
.
D-5
Check the hydraulic system
.
D-6
Main cartridge of the engine air
filter
.
D-7
Cab air filter.
D-8
Hydraulic oil filter of the
transmission.
Summary of Contents for Telelift 3713 SX
Page 4: ...Courtesy of Crane Market...