change the fork compensation cylinder
1
2,00
change the fork compensation cylinder kit
1
1,30
change the valve of the fork compensation cylinder
1
0,45
check the one-way valves
of the fork compensation cylinder
1
0,30
change the machine sway cylinder
1
1,30
change the machine sway cylinder kit
1
1,30
change the machine sway cylinder valve
1
0,30
change the boom internal line
for the boom extension
1
1,30
change the boom internal line for the fork pitching
1
1,30
change the boom internal line for the fork locking
1
2,00
change the boom slide pads
1
3,00
check the pressure of the drive pump
2
0,30 each
check the pressure of the main actuator operating the boom
movements
2
0,30 each
check the pressure of brake pump and hydrostatic steering unit
1
0,30
check the safety valves
1
0,30
change the drive pump
1
3,00
change the drive motor
1
3,00
change and test motor, pump and
transmission lines
1
6,00
change the actuator control pump
1
1,30
change and calibrate the actuator
1
2,00
change the pump on the engine injection line
1
1,00
change the boom movement selector switch
1
0,30
change relays and fuses
1
0,15 each
change the windscreen wiper motor
1
1,00
change a solenoid valve
1
0,30
change the gas pedal complete with cord
1
1,00
change the manual throttle complete with cord
1
1,00
change the front axle shaft
1
3,00
change the rear axle shaft
1
3,00
change 1 cardan joint
1
1,00
change the axle shaft hub
1
1,30
change the boom assy
2
5,00 each
change the boom anchoring pin
2
1,00 each
change the attachment locking cylinder pins
1
0,30