TELELIFT 3713 SX
SCHEDULED MAINTENANCE INSPECTIONS
Document 57.4402.9200 - 1
st
Edition 10/2006
INDEX
. ABOUT THIS SECTION
Intervention times
Maintenance interventions have been divided into 7
different groups in relation to the time at which they
must be carried out, say daily, weekly, monthly, every
2 months, every 6 months, yearly and every 5 years
(afterwards every 2 years).
For ease of use, the service intervals have been grouped
in different tables, as explained below:
Inspection
Table
Daily
A
Weekly
A+B
Monthly
A+B+C
Every two months
A+B+C+D
Every six months
A+B+C+D+E
Yearly
A+B+C+D+E+F
Every 5 years (afterwards every 2 years)
G
Maintenance table
The maintenance table contains general information
on the type of intervention to be carried out at a certain
interval.
For the explanation of the maintenance jobs to be done,
please refer to chapter 4 “Maintenance Procedures”.
Maintenance inspection report
The maintenance report summarises all of the interventions
to be carried at a given interval and lets the maintenance
technician note the result of the check or intervention
carried out.
This card can be photocopied to be used at the different
service intervals and to keep a trace of all interventions
carried out.
Summary of Contents for Telelift 3713 SX
Page 4: ...Courtesy of Crane Market...