7
TELELIFT 3713 SX
SCHEDULED MAINTENANCE INSPECTIONS
4
7
Document 57.4402.9200 - 1
st
Edition 10/2006
INDEX
B-4 CHECK THE TIGHTENING OF THE WHEEL
NUTS
If you have to check the tightening of the wheel bolts or
replace a wheel, proceed as follows:
-
Raise the machine using a hydraulic jack.
-
Remove the wheel rolling it on the ground
- Line up the wheel with the axle and fit the 8 nuts.
-
Tighten the nuts following the alternate sequence
shown in the picture with a pneumatic screwdriving
machine.
-
Lower the machine to the ground.
Re-tighten all nuts to a torque 440 Nm
.
Check the tightening of wheels one hour after the job.
They might get loose until they do not stay correct.
On new machines, and when a wheel has been di-
sassembled or replaced, check the nut torque of the
wheels every 2 hours until they stay correct.
Always use tyres having the dimensions indicated
in the vehicle registration card.
1
4
5
6
7
8
STANDARD
OPTIONAL
Telelift 71 SX
Telelift 71 SX
Dimensions
(front and rear)
405/70 R20
405/70 R24
P.R.
(or load index)
14 pr
14 pr
Rim
13x20
13x24
Wheel disc
8 holes DIN 70361
8 holes DIN 70361
Pressure
bar/Psi
5.5/80
4.5/65
Summary of Contents for Telelift 3713 SX
Page 4: ...Courtesy of Crane Market...