![Suez Sievers M500e Operation And Maintenance Manual Download Page 73](http://html1.mh-extra.com/html/suez/sievers-m500e/sievers-m500e_operation-and-maintenance-manual_1389721073.webp)
I
NSTALLATION
.............................
Sievers M500e TOC Analyzer
Operation and Maintenance Manual
DLM 78510-02 EN Rev. B
73
SUEZ © 2022
S
TEP
5: I
NSTALL
P
OWER
This section contains information about how to install power to the Analyzer.
Installing the AC Conduit
The Sievers M500e TOC Analyzer requires the installation of conduit to provide an
external source of AC power, which is connected to the enclosure using a water-tight
conduit connector. This type of electrical connection should be performed by a qualified
electrician.
SUEZ recommends an external switch or circuit breaker (rated 2-5A) to facilitate
maintenance and servicing of the Analyzer. Install it near the Analyzer and clearly mark
it as the disconnecting device for the Analyzer.
To wire the AC conduit
Provide the following for this procedure:
•
Insulated wire for AC power conduit (18-12 AWG), rated to 300 Volts (Strip
length should be 8
-
9 mm (0.33 in.)
•
(Optional) Metallic AC power conduit
1
[Alternatively, a PVC conduit
connector (strain relief hub) and sealing washer is provided in the
Accessories Kit.]
•
Terminal ring (M4 / #8) for AC conduit ground wire (18-12 AWG), provided
in Accessories kit (If using wire of a different gauge, an appropriate terminal
ring is needed.)
•
Recommended external circuit breaker or switch that disconnects both
poles of the supply voltage, rated 2-5A
1. Ensure to exercise ESD protection while working inside the Analyzer.
2.
If needed, unlock and push the release button to unlatch and open the door to
the Analyzer.
3.
If previously replaced, remove the electrical cover (located on the left side of
the bulkhead). Turn the fasteners 1/4 turn to release.