![Suez Sievers M500e Operation And Maintenance Manual Download Page 64](http://html1.mh-extra.com/html/suez/sievers-m500e/sievers-m500e_operation-and-maintenance-manual_1389721064.webp)
I
NSTALLATION
.............................
Sievers M500e TOC Analyzer
Operation and Maintenance Manual
DLM 78510-02 EN Rev. B
64
SUEZ © 2022
To install I/O wiring
The wire should be 16-22 AWG, rated to 300 V. The strip length for each pin
should be 8
-
9 mm (0.33 in).
1. Ensure to exercise ESD protection while working inside the Analyzer.
2.
Unlock and push the release button to unlatch and open the door to the
Analyzer.
3.
Remove the following covers (Turn the fasteners 1/4 turn to release.):
•
AC Power cover
(A)
, located on the left side of the Analyzer
•
I/O Control wiring cover
(B)
, located at the top of the Analyzer
(A)
(B)