![Suez Sievers M500e Operation And Maintenance Manual Download Page 279](http://html1.mh-extra.com/html/suez/sievers-m500e/sievers-m500e_operation-and-maintenance-manual_1389721279.webp)
M
AINTENANCE
.............................
Sievers M500e TOC Analyzer
Operation and Maintenance Manual
DLM 78510-02 EN Rev. B
279
SUEZ © 2022
5.
Locate the UV lamp enclosure at the right of the Analyzer (
). The UV lamp has a red and black wire with a black connector
extending from the UV Lamp Holder.
6.
Disconnect the black power connector from the bulkhead connector by turning
the connector and then carefully pulling the two halves of the plug apart.
7.
Slowly slide the UV lamp out of the enclosure.
8.
Put on the glove provided with the new UV lamp, to avoid leaving fingerprints
on the quartz bulb of the lamp.
9.
Remove the new lamp from the packet.
10.
Carefully slide the lamp assembly into the enclosure. Stop if feeling any
resistance and realign the lamp in the reactor.
NOTE:
This photo is for illustration only. The Holder is removed from its
installed position. Insert the UV Lamp into the Holder on the UV Reactor.
11.
Connect the power connector to the bulkhead connector by aligning yellow
lines and pushing firmly until the locking mechanism clicks. Gently pull on the
power connector to make sure it is securely attached to the power supply.
12.
Record the installation date for the lamp in the service log (
).
13.
If planning to replace other consumables, follow the procedures listed in the
appropriate sections of this chapter. Otherwise, close and latch the Analyzer
door.
14.
Re-establish power to the Analyzer.