![Suez Sievers M500e Operation And Maintenance Manual Download Page 207](http://html1.mh-extra.com/html/suez/sievers-m500e/sievers-m500e_operation-and-maintenance-manual_1389721207.webp)
TOC S
INGLE
P
OINT
C
ALIBRATION
P
ROTOCOL
.............................
Sievers M500e TOC Analyzer
Operation and Maintenance Manual
DLM 78510-02 EN Rev. B
207
SUEZ © 2022
•
Vial 1–3 — Select these tabs to view analysis details for each
standard, as
needed.
•
Summary — Select this tab to view the summary of analysis, including
passed
or
failed
results. It also contains the
Apply
,
Reject
,
, and
Export
buttons.
5.7 Referencing the
Summary
tab, record the results data on the
TOC Single
Point Calibration Worksheet
.
5.8 Do one of the following:
5.8.1 If the calibration
passed
, click
Apply
to accept the calibration. A
confirmation message appears. Click
Apply Calibration
, then
Close
.
5.8.2 If the calibration
failed
, leave the screen as is and contact Technical
Support or your local service provider. Before calling, e-mail the backup
and system settings files (created in advance of running calibration
protocols). After analysis of the data, you may be advised to accept the
results or to pursue additional troubleshooting steps.
5.9 To print or export the results, click the corresponding button.