![Suez Sievers M500e Operation And Maintenance Manual Download Page 311](http://html1.mh-extra.com/html/suez/sievers-m500e/sievers-m500e_operation-and-maintenance-manual_1389721311.webp)
I
NSTALLING
THE
RESIN
CARTRIDGE
.............................
Sievers M500e TOC Analyzer
Operation and Maintenance Manual
DLM 78510-02 EN Rev. B
311
SUEZ © 2022
9.
To prime the DI Water pump
This priming process helps to properly clear the DI Loop of air bubbles and
saturate the resin cartridge. The priming process takes approximately 180
minutes, plus minimal setup and reset time.
1. Continue from the previous section
To fill the DI water reservoir
.
2.
Move the resin cartridge from the
Run
position to the
Prime
position. Press
the top latch of the resin cartridge to release it and gently rotate the top of
cartridge to the
Prime
position. Push to insert the elbow-fitting into the
Prime
port, while leaving the lower elbow-fitting end in the DI pump outlet.
Verify that the ends are secure before moving to the next step.