RA7000 and ESA10000 Storage Subsystems
2–20
EK–SMCPP–UG. A01
3. At this time, install the ECB into the right position (viewed from the rear) of
the ECB shelf, as shown in Figure 2-11. Install two ECB Y-cables , as
shown in Figure 2-12 and tie-wrap them to the SW600 cabinet’s inner
vertical rails. These cables will be connected to the ECB during a later step
in this procedure.
Figure 2–12 ECB Position
CXO5827A
ECB
Figure 2–13 Installing ECB Y-Cables
Cache
module
External cache
battery
CXO5928A
Unconnected
Unconnected