RA7000 nd ESA10000 Storage Subsystems
iv
EK–SMCPP–UG. A01
1
Product Description (continued)
1.10 Subsystem Cooling ................................................................................................ 1–28
1.11 Setting the PVA SCSI Address .............................................................................. 1–30
1.11.1 DIGITAL Supported Master PVA Address ........................................................ 1–31
1.11.2 DIGITAL Supported Expansion PVA Addresses................................................ 1–32
1.11.3 Non-Supported PVA SCSI Bus Addresses ......................................................... 1–32
2
Unpacking and Installation for the RA7000 and ESA10000 Storage Subsystems
2.1 Installing the RA7000................................................................................................ 2–1
2.1.1 Site Preparation ..................................................................................................... 2–2
2.1.2 Unpacking the RA7000 Subsystem Enclosure........................................................ 2–2
2.1.3 Removing the RA7000 from the Pallet .................................................................. 2–3
2.1.4 Placing the RA7000 Storage Enclosure.................................................................. 2–5
2.1.5 Connecting the Enclosure to the Host .................................................................... 2–5
2.2 Installing the ESA10000............................................................................................ 2–6
2.2.1 Site Preparation ..................................................................................................... 2–6
2.2.2 Unpacking the ESA10000 Subsystem Enclosure .................................................... 2–7
2.2.3 Removing the ESA10000 from the Pallet............................................................... 2–9
2.2.4 Moving the ESA10000 to It’s Designated Site ..................................................... 2–13
2.2.5 Joining Adjacent ESA10000’s ............................................................................. 2–13
2.2.6 Leveling the Cabinet............................................................................................ 2–16
2.3 Installing Additional Components ........................................................................... 2–16
2.3.1 Installing the BA370 Rack-Mountable Enclosure................................................. 2–16
2.4 Cabling a Master Enclosure to an Expansion Enclosure(s)....................................... 2–24
2.4.1 Cabling Sequence ................................................................................................ 2–24
2.4.2 Attaching the SE I/O Cables ................................................................................ 2–24
2.4.2.1 Single Expansion Unit ...................................................................................... 2–25
2.4.2.2 Two Expansion Units........................................................................................ 2–26
2.4.3 Attaching the EMU Communications Cable......................................................... 2–27
2.4.4 Setting the PVA Addresses .................................................................................. 2–28
2.5 Connecting SCSI Bus Cables to the ESA10000........................................................ 2–30
2.6 Installing SBBs........................................................................................................ 2–32
2.6.1 Installing SBB Disk Drives.................................................................................. 2–32
2.6.2 Installing SBB Power Supplies ............................................................................ 2–34
2.6.3 Installing the AC Input Power Controller............................................................. 2–35
2.6.4 Installing the External Cache Battery (ECB)........................................................ 2–36
3
Configuring the Storage Cabinet
3.1 Configuring the EMU ................................................................................................ 3–1
3.1.1 Connecting the EMU Communications Bus ........................................................... 3–2
3.1.2 Setting the Temperature Sensors............................................................................ 3–2
3.1.3 Setting the Blower Speed Control .......................................................................... 3–3
3.1.4 Alarm Control Switch............................................................................................ 3–4