Chapter 2. Unpacking and Installation
EK–SMCPP–UG. A01
2–5
3. Grasping the sheet metal base assembly, carefully lift the rear of the storage
cabinet over the “hump” in the center of the pallet and then roll the cabinet off
the pallet and down the ramp to the floor. If any further lifting of the cabinet is
required, grasp the sheet metal base assembly on the side and lift it carefully.
4. Retain the shipping container and all packing materials.
2.1.4 Placing the RA7000 Storage Enclosure
Use the following procedure to move the storage cabinet to its designated site:
WARNING
To prevent damage to the cabinet and injury to
personnel, make sure to provide a clear path for
the casters.
1. Roll the expansion cabinet to the desired location.
2. If required, engage the lock on each front caster to prevent the cabinet from
moving.
2.1.5 Connecting the Enclosure to the Host
Refer to the Getting Started Installation Guide for specific instructions
describing how to connect the RAID Array 7000 subsystem to the host.