RA7000 and ESA10000 Storage Subsystems
2–10
EK–SMCPP–UG. A01
Figure 2–6 Shipping Pallet Ramp Installation
4. Extend the ramps to their full length.
5. See Figure 2-7 for the location of the shipping bolts. Remove the bolts.
6. Remove the shipping brackets, shown in Figure 2-7, from the cabinet
levelers and set them aside.