7-23
764333-675
7. Install new UV lamp by sliding into the UV chamber
slowly and rotating clockwise into the locked
position, as shown in Figure 7-27.
8. Install UV chamber lamp socket.
• Press socket firmly and evenly onto the lamp pins
• Align banana jack on lamp socket with slot on
the sleeve bolt
9. Lock the lamp socket using wire form. Pinch to lock
wire under locking tabs as shown in Figure 7-28.
10. Install shroud cover onto the standoffs on the
shroud plate using the pan head screws as shown
in Figure 7-29. After installation of a new lamp,
reset the elapse-time meter on the lamp power
supply. See Figure 7-29 and
Figure 7-27. Install New UV Lamp
Figure 7-28. Lock Lamp Socket with Wire Form
Figure 7-29. Install Shroud Cover
Summary of Contents for SYSTEM 1E
Page 1: ...MAINTENANCE MANUAL SYSTEM 1E Liquid Chemical Sterilant Processing System 12 09 10 P764333 674 ...
Page 3: ......
Page 71: ...5 19 764333 675 Figure 5 2 Analog Cable Assembly Pin Out Locations ...
Page 74: ...5 22 764333 675 Figure 5 7 DC Power Supply Harness Pin Out Locations PS P1 ...
Page 96: ...7 19 764333 675 Figure 7 17 Aquafine STERIUV5 Control Panel The Control Panel A B 3 2 1 ...
Page 108: ......
Page 110: ...ii 764333 676 Example 1 How To Use IPB Page Typical ...
Page 119: ...10 764333 676 Figure 1 SYSTEM 1E Piping Schematic ...
Page 121: ...12 764333 676 Figure 2 SYSTEM 1E Complete 4 3 2 ...
Page 128: ...19 764333 676 Figure 5 Fluid and Air Components 2 of 2 51 53 48 47 50 49 52 ...
Page 133: ...24 764333 676 Figure 7 Float Block Switch Assembly 1 5 8 7 5 4 10 4 2 6 9 9 3 CK2 CK3 LS3 CK1 ...
Page 137: ...28 764333 676 Figure 9 Drain Block Assembly 3 4 5 6 7 3 1 2 8 CK8 TC3 ...
Page 143: ...34 764333 676 Figure 12 Bulkhead Connector Assembly 1 2 2 2 3 1 1 3 5 4 4 6 ...
Page 155: ...46 764333 676 Figure 18 Harness Cable Assemblies 1 of 2 1 2 3 4 5 6 P10 PT1 P5B P11 P2 P5A ...
Page 166: ......
Page 167: ......
Page 168: ......
Page 169: ......
Page 170: ......