3. Remove 10-24 x ¾" pan screw from sleeve bolt
opposite of the lamp socket. Turn sleeve bolt 90°
counter-clockwise and remove from chamber end
as shown below.
4. Install the horizontal fan mounting bracket
(shipped with the UV Water Treatment System)
over the chamber ears as shown in Figure 7-43.
5. Re-install sleeve bolt and secure with locking pan-
head screw as shown in Figure 7-44.
6. Slip fan cover on and secure with four pan-head
screws as shown below.
Figure 7-41. Remove and Discard Heat Sink
Figure 7-42. Remove 10-24 x 3/4" Pan Head
Screw
Remove 10-24 x 3/4"
Screw
Figure 7-43. Install Fan Mounting Bracket
Figure 7-44. Re-install Sleeve Locking Screw
Re-install 10-24 x 3/4"
Screw
Summary of Contents for SYSTEM 1E
Page 1: ...MAINTENANCE MANUAL SYSTEM 1E Liquid Chemical Sterilant Processing System 12 09 10 P764333 674 ...
Page 3: ......
Page 71: ...5 19 764333 675 Figure 5 2 Analog Cable Assembly Pin Out Locations ...
Page 74: ...5 22 764333 675 Figure 5 7 DC Power Supply Harness Pin Out Locations PS P1 ...
Page 96: ...7 19 764333 675 Figure 7 17 Aquafine STERIUV5 Control Panel The Control Panel A B 3 2 1 ...
Page 108: ......
Page 110: ...ii 764333 676 Example 1 How To Use IPB Page Typical ...
Page 119: ...10 764333 676 Figure 1 SYSTEM 1E Piping Schematic ...
Page 121: ...12 764333 676 Figure 2 SYSTEM 1E Complete 4 3 2 ...
Page 128: ...19 764333 676 Figure 5 Fluid and Air Components 2 of 2 51 53 48 47 50 49 52 ...
Page 133: ...24 764333 676 Figure 7 Float Block Switch Assembly 1 5 8 7 5 4 10 4 2 6 9 9 3 CK2 CK3 LS3 CK1 ...
Page 137: ...28 764333 676 Figure 9 Drain Block Assembly 3 4 5 6 7 3 1 2 8 CK8 TC3 ...
Page 143: ...34 764333 676 Figure 12 Bulkhead Connector Assembly 1 2 2 2 3 1 1 3 5 4 4 6 ...
Page 155: ...46 764333 676 Figure 18 Harness Cable Assemblies 1 of 2 1 2 3 4 5 6 P10 PT1 P5B P11 P2 P5A ...
Page 166: ......
Page 167: ......
Page 168: ......
Page 169: ......
Page 170: ......