7-7
764333-675
7.7
SEAL REPLACEMENT PROCEDURE
Replace inflatable seal as follows.
Procedure:
1. Turn power OFF to unit.
2. Open Lid assembly and remove device tray.
3. Pull inflatable seal out of retaining bars and corner
clips.
4. Pull air line from hole in drip pan assembly and
disconnect quick disconnect coupler.
5. Check retaining bars and clips for any sharp edges.
Remove any sharp edges with sand paper or file.
6. Install new inflatable seal by connecting quick
disconnect coupler. Pull on line and coupler to
ensure it is connected properly.
7. Place inflatable seal in forward retaining bar at an
angle pushing under retaining bar lip.
8. Using a 1/8” Allen wrench elbow (rounded edge),
push the other side under opposite lip of retaining
bar. Repeat for each retaining bar and clip.
9. Use
S
ECTION
6.4.7
S
EAL
L
EAK
T
EST
AND
C
OMPRESSOR
O
UTPUT
T
EST
to check new seal for any leaks prior
to running a liquid chemical sterilant processing
cycle.
7.8
PINCH VALVE SLEEVE
REPLACEMENT PROCEDURE
Procedure:
1. Turn OFF power and water supply to SYSTEM 1E
Liquid Chemical Sterilant Processing System.
2. Remove shroud.
3. Using a strap wrench or similar tool, loosen caps on
both ends of pinch valve. Remove body from
SYSTEM 1E Liquid Chemical Sterilant Processing
System.
4. Remove old pinch valve sleeve.
5. Clean body and caps of any foreign matter.
6. Install new sleeve into valve body.
7. Apply Vacuum Grease P/N 400033 to both faces of
the sleeve.
8. Install body and hand-tighten both caps. Caps are
fully tight when a 0.030" (±0.005") gap (use a feeler
gauge) is present between the cap and the body. See
Figure 7-14.
Figure 7-12. Connect Quick Disconnect
Coupler
Figure 7-13. Press Seal in Place Using Allen
Wrench Elbow
Summary of Contents for SYSTEM 1E
Page 1: ...MAINTENANCE MANUAL SYSTEM 1E Liquid Chemical Sterilant Processing System 12 09 10 P764333 674 ...
Page 3: ......
Page 71: ...5 19 764333 675 Figure 5 2 Analog Cable Assembly Pin Out Locations ...
Page 74: ...5 22 764333 675 Figure 5 7 DC Power Supply Harness Pin Out Locations PS P1 ...
Page 96: ...7 19 764333 675 Figure 7 17 Aquafine STERIUV5 Control Panel The Control Panel A B 3 2 1 ...
Page 108: ......
Page 110: ...ii 764333 676 Example 1 How To Use IPB Page Typical ...
Page 119: ...10 764333 676 Figure 1 SYSTEM 1E Piping Schematic ...
Page 121: ...12 764333 676 Figure 2 SYSTEM 1E Complete 4 3 2 ...
Page 128: ...19 764333 676 Figure 5 Fluid and Air Components 2 of 2 51 53 48 47 50 49 52 ...
Page 133: ...24 764333 676 Figure 7 Float Block Switch Assembly 1 5 8 7 5 4 10 4 2 6 9 9 3 CK2 CK3 LS3 CK1 ...
Page 137: ...28 764333 676 Figure 9 Drain Block Assembly 3 4 5 6 7 3 1 2 8 CK8 TC3 ...
Page 143: ...34 764333 676 Figure 12 Bulkhead Connector Assembly 1 2 2 2 3 1 1 3 5 4 4 6 ...
Page 155: ...46 764333 676 Figure 18 Harness Cable Assemblies 1 of 2 1 2 3 4 5 6 P10 PT1 P5B P11 P2 P5A ...
Page 166: ......
Page 167: ......
Page 168: ......
Page 169: ......
Page 170: ......