5-9
764333-675
5.2 DIAGNOSTIC CYCLE FAULTS
5.2.1
A/D Converter Fault
Description
– Control monitors a fixed resistor for
known values.
Action:
1. Check wiring connections at power supply and
control board – repair. (Refer to Figures 5-4 and 5-7.)
2. Faulty power supply – replace.
3. Faulty control board – replace.
4. Faulty transducer – replace.
5.2.2
Inlet H2O Temp < 43°C
Description
– Control monitors TC3 drain block
during the water dump phase. Temperature must be
> 43°C or alarm occurs.
Action:
1. Check that water supply is ON.
2. Facility water temperature is < 43°C – correct.
3. Faulty control board – replace.
4. Faulty TC3 – recalibrate. (Refer to Figure 5-2.)
5. Faulty SOL5 – replace. (Refer to Figure 5-5.)
6. Low air pressure – check compressor/LS5 air
piping components.
7. Faulty LS2 – replace.
5.2.3
UV Intensity Timeout
Description:
SYSTEM 1E Processor senses UV
intensity signal is below 15.0 mA after 10 minutes.
Action:
1. UV system unplugged – plug into receptacle.
2. Fouled (dirty) quartz sleeve – clean.
3. UV monitor harness not connected – plug into
connector on rear of processor.
4. Faulty UV monitor – replace.
5. Faulty UV lamp – replace.
6. Ballast circuit breaker tripped – reset.
7. Faulty UV lamp ballast – replace.
5.2.4
UV Lamp Below 14.5 mA
Description
- SYSTEM 1E Processor detects a UV
intensity of less than 14.5 mA.
Action:
1. Fouled (dirty) Quartz sleeve – clean.
2. UV monitor harness not connected – plug into
connector on rear panel of processor.
3. Faulty UV monitor – replace.
4. Faulty UV lamp – replace.
5. Ballast circuit breaker tripped – reset.
6. Faulty UV lamp ballast – replace.
Summary of Contents for SYSTEM 1E
Page 1: ...MAINTENANCE MANUAL SYSTEM 1E Liquid Chemical Sterilant Processing System 12 09 10 P764333 674 ...
Page 3: ......
Page 71: ...5 19 764333 675 Figure 5 2 Analog Cable Assembly Pin Out Locations ...
Page 74: ...5 22 764333 675 Figure 5 7 DC Power Supply Harness Pin Out Locations PS P1 ...
Page 96: ...7 19 764333 675 Figure 7 17 Aquafine STERIUV5 Control Panel The Control Panel A B 3 2 1 ...
Page 108: ......
Page 110: ...ii 764333 676 Example 1 How To Use IPB Page Typical ...
Page 119: ...10 764333 676 Figure 1 SYSTEM 1E Piping Schematic ...
Page 121: ...12 764333 676 Figure 2 SYSTEM 1E Complete 4 3 2 ...
Page 128: ...19 764333 676 Figure 5 Fluid and Air Components 2 of 2 51 53 48 47 50 49 52 ...
Page 133: ...24 764333 676 Figure 7 Float Block Switch Assembly 1 5 8 7 5 4 10 4 2 6 9 9 3 CK2 CK3 LS3 CK1 ...
Page 137: ...28 764333 676 Figure 9 Drain Block Assembly 3 4 5 6 7 3 1 2 8 CK8 TC3 ...
Page 143: ...34 764333 676 Figure 12 Bulkhead Connector Assembly 1 2 2 2 3 1 1 3 5 4 4 6 ...
Page 155: ...46 764333 676 Figure 18 Harness Cable Assemblies 1 of 2 1 2 3 4 5 6 P10 PT1 P5B P11 P2 P5A ...
Page 166: ......
Page 167: ......
Page 168: ......
Page 169: ......
Page 170: ......