2-3
764333-675
This menu allows the setting time spent in AIR TEST.
This is detailed later in this section. After setting the
time, press
SAVE VALUES
touch pad. Display shows:
FACTORY CHECK
CHECKING ANALOG
The control checks Thermocouples TC1, TC2, and TC3,
the ambient temperature sensor on the CPU, and the
concentration monitor probes CP1 and CP2. The unit
must be at ambient temperature and the concentration
probes dry to pass. If failure is detected, printout states
failure and display returns to Main Menu:
CHECK SF HOLD
AIRTEST BATTERY
Once analog checks pass, Select
CHECK
, then press
SAVE VALUES
touch pad. Display shows:
FACTORY TEST
OPEN & CLOSE LID
This checks operation of lid switch. Open the lid,
Display shows:
FACTORY TEST
LID OPEN
Close lid. Display shows:
FACTORY TEST
VERIFY S2 ON & OFF
Check audible indication that S2 (seal relief, SOL2) is
energized and de-energized. The controls allow five
seconds to verify. Then display shows:
FACTORY TEST
VERIFY P1 ON & OFF
Check audible indication that P1 (circulation pump) is
energized and de-energized. Control allows five
seconds to verify. Display shows:
FACTORY TEST
COMP1 CONTROL ON
Compressor runs to pressure switch setting and then
control holds for two minutes. At the end of two
minutes, counter (previously selected) counts down.
Display shows:
AIR TEST XX:XX
At end of successful air test, display shows:
PRESS SAVE VALUES
TO CONTINUE
Press
SAVE VALUES
touch pad. Display shows:
VERIFY LATCH GAP
PRESS SAVE VALUES TO CONT
The latch gap can be checked. Press
SAVE VALUES
touch pad. Display shows:
FACTORY TEST
VERIFY S7 ON & OFF
Check audible indication that S7 (inlet fill valve, SOL7)
is energized and de-energized. Control allows five
seconds to verify. Display shows:
FACTORY TEST
VERIFY S5 ON & OFF
Check audible indication that S5 (dump valve, SOL5)
is energized and de-energized. Control allows five
seconds to verify. Display shows:
FACTORY TEST
VERIFY DRAIN OFF
Summary of Contents for SYSTEM 1E
Page 1: ...MAINTENANCE MANUAL SYSTEM 1E Liquid Chemical Sterilant Processing System 12 09 10 P764333 674 ...
Page 3: ......
Page 71: ...5 19 764333 675 Figure 5 2 Analog Cable Assembly Pin Out Locations ...
Page 74: ...5 22 764333 675 Figure 5 7 DC Power Supply Harness Pin Out Locations PS P1 ...
Page 96: ...7 19 764333 675 Figure 7 17 Aquafine STERIUV5 Control Panel The Control Panel A B 3 2 1 ...
Page 108: ......
Page 110: ...ii 764333 676 Example 1 How To Use IPB Page Typical ...
Page 119: ...10 764333 676 Figure 1 SYSTEM 1E Piping Schematic ...
Page 121: ...12 764333 676 Figure 2 SYSTEM 1E Complete 4 3 2 ...
Page 128: ...19 764333 676 Figure 5 Fluid and Air Components 2 of 2 51 53 48 47 50 49 52 ...
Page 133: ...24 764333 676 Figure 7 Float Block Switch Assembly 1 5 8 7 5 4 10 4 2 6 9 9 3 CK2 CK3 LS3 CK1 ...
Page 137: ...28 764333 676 Figure 9 Drain Block Assembly 3 4 5 6 7 3 1 2 8 CK8 TC3 ...
Page 143: ...34 764333 676 Figure 12 Bulkhead Connector Assembly 1 2 2 2 3 1 1 3 5 4 4 6 ...
Page 155: ...46 764333 676 Figure 18 Harness Cable Assemblies 1 of 2 1 2 3 4 5 6 P10 PT1 P5B P11 P2 P5A ...
Page 166: ......
Page 167: ......
Page 168: ......
Page 169: ......
Page 170: ......