7-5
764333-675
11. Loosen the 8-32 setscrew from gas spring cylinder
locking clevis pin.
WARNING – PERSONAL INJURY OR
EQUIPMENT DAMAGE HAZARD: Lid
assembly is heavy. Always support lid
assembly when gas spring cylinder is removed.
12. Thread an 8-32 screw into threaded hole of locking
clevis pin. Hold lid open with right hand and pull
clevis pin out using 8-32 screw with left hand. Lean
lid assembly back past 90° position and support in
place.
13. Support the control assembly with right hand and
remove two remaining screws from control hinges.
Lift drip pan assembly from front edge so trim
band is removed from lower shroud and slide
control assembly through drip pan band opening
and set on electronics enclosure.
14. Secure control assembly back to the frame using
one screw into each hinge.
15. Secure lid assembly by reinstalling clevis pin into
gas spring cylinder.
16. Replaceable components are now accessible and
available for servicing.
7.4
ASPIRATOR ASSEMBLY LEAK
TEST PROCEDURE
Equipment, Fixtures, Special Tools:
1. Container with approximately 6" (152 mm) of water.
2. Length of 1/8" tubing (approximately 12"
[305 mm]).
3. 50 cc syringe.
Procedure:
1. Remove aspirator to be tested from tubing on
adapter tray.
2. Install 1/8" tubing onto aspirator’s 90° elbow and
attach other end of tubing to syringe.
3. Plug orifice on end of aspirator probe with finger.
4. Submerge top of aspirator in water.
5. Using syringe, force air into aspirator and check for
leaks, air bubbles. If leaks occur, aspirator should
be replaced.
Figure 7-9. Loosen Control Hinge Screws
Figure 7-10. Loosen Gas Spring Setscrew
!
Figure 7-11. Remove Gas Spring Clevis Pin
Summary of Contents for SYSTEM 1E
Page 1: ...MAINTENANCE MANUAL SYSTEM 1E Liquid Chemical Sterilant Processing System 12 09 10 P764333 674 ...
Page 3: ......
Page 71: ...5 19 764333 675 Figure 5 2 Analog Cable Assembly Pin Out Locations ...
Page 74: ...5 22 764333 675 Figure 5 7 DC Power Supply Harness Pin Out Locations PS P1 ...
Page 96: ...7 19 764333 675 Figure 7 17 Aquafine STERIUV5 Control Panel The Control Panel A B 3 2 1 ...
Page 108: ......
Page 110: ...ii 764333 676 Example 1 How To Use IPB Page Typical ...
Page 119: ...10 764333 676 Figure 1 SYSTEM 1E Piping Schematic ...
Page 121: ...12 764333 676 Figure 2 SYSTEM 1E Complete 4 3 2 ...
Page 128: ...19 764333 676 Figure 5 Fluid and Air Components 2 of 2 51 53 48 47 50 49 52 ...
Page 133: ...24 764333 676 Figure 7 Float Block Switch Assembly 1 5 8 7 5 4 10 4 2 6 9 9 3 CK2 CK3 LS3 CK1 ...
Page 137: ...28 764333 676 Figure 9 Drain Block Assembly 3 4 5 6 7 3 1 2 8 CK8 TC3 ...
Page 143: ...34 764333 676 Figure 12 Bulkhead Connector Assembly 1 2 2 2 3 1 1 3 5 4 4 6 ...
Page 155: ...46 764333 676 Figure 18 Harness Cable Assemblies 1 of 2 1 2 3 4 5 6 P10 PT1 P5B P11 P2 P5A ...
Page 166: ......
Page 167: ......
Page 168: ......
Page 169: ......
Page 170: ......