Protected by copyright. Copying for private or commercial purposes, in part or in whole, is not
permitted unless authorised by SEAT S.A. SEAT S.A does not guarantee or accept any liability with
respect to the correctness of information in this document. Copyright by SEAT S.A.
7
High-pressure pump
⇒ “7.1 Exploded view - high-pressure pump”, page 245
⇒ “7.2 Removing and installing high-pressure pump”, page 247
⇒ “7.3 Removing and installing high-pressure pipe”, page 248
7.1
Exploded view - high-pressure pump
Version 1, Hitachi
1 - Roller tappet
❑ When installing lubri‐
cate lightly with clean
engine oil
2 - O-ring
❑ renew
❑ When installing lubri‐
cate lightly with clean
engine oil
3 - High-pressure pump
❑ With fuel metering valve
- N290-
❑ Do not dismantle
❑ Removing and installing
4 - High-pressure pipe
❑ Removing and installing
❑ Check for damage be‐
fore re-installing.
❑ Do not alter shape.
❑ Connections must not
be damaged
❑ Lubricate threads of un‐
ion nuts with clean en‐
gine oil
❑ 16 Nm + 45°
5 - Bolt
❑ renew
❑ Tightening torque and
.
6 - Hose clip
7 - Fuel supply line
8 - Electric connector
Version 2, Continental
León 2013 ➤ , León ST 2013 ➤
4-cylinder petrol engine (1.2 l direct injection, 4 V, turbocharger, EA211) - Edition 02.2017
7. High-pressure pump
245