
Synergy Q/MD Engineering Manual (v9.1 MD)
Physical Installation • 3–17
MD/X Frame
Opening and Removing the Frame Door
Use the following procedure to remove the frame door:
1. Gently pull the door latch out and up, releasing the door from the top of the frame. The
door retainer prevents the door from falling.
Frame Door Overview (MD Shown)
2. With both hands, grasp the sides of the door, and gently lift it. Rotate the bottom towards
you until the bottom edge clears the pivoting tongue on which it rests, and the door
retainer is free of the frame top plate.
3. Move the door away from the frame, and place it on a clean, flat surface.
This completes the procedure for removing the frame door.
Installing and Closing the Frame Door
Use the following procedure to install the frame door:
1. With both hands, grasp the sides of the frame door, and, ensuring that the door retainer is
under the top of the frame, hook the grooved bottom edge over the pivoting tongue on
the bottom front ledge of the frame.
Caution
The MD frame door is
completely
removable and quite heavy. Care
must be taken when performing these procedures.
Top of Frame
Door Retainer
Door Latch
Frame Door
Summary of Contents for Synergy MD
Page 1: ...Ross Video Limited Synergy Q MD Engineering Manual Volume I Software Issue 9 1 MD ...
Page 10: ......
Page 18: ...viii Contents Synergy Q MD Engineering Manual v9 1 MD ...
Page 46: ...1 28 Introduction Synergy Q MD Engineering Manual v9 1 MD ...
Page 204: ...7 34 BNC Configuration and Check Synergy Q MD Engineering Manual v9 1 MD ...
Page 302: ...10 56 Custom Controls Synergy Q MD Engineering Manual v9 1 MD ...
Page 366: ...13 16 SmartConversion Synergy Q MD Engineering Manual v9 1 MD ...
Page 370: ...GL 4 Glossary of Terms Synergy Q MD Engineering Manual v9 1 MD ...