
Synergy Q/MD Engineering Manual (v9.1 MD)
Preliminary Cabling and Video Installation • 4–9
Power Up
Use the following procedure to power up the system:
1. Ensure the following power pre-requisites are met:
•
All power cables are fastened and secure.
•
For control panel redundancy (if installed), ensure that two independent AC sources
are used to feed the control panel power supplies.
2. (
For Synergy 2 and 2.5 Control Panels Only
) Control panel power switches are located
inside the control panel tub, on the right-hand side. Open the panel tub and turn on the
Primary
and (if installed) the
Redundant
power switches.
3. (
For Synergy 1 Control Panels Only
) Control panel power switches are located on the
rear of the control panel, one on either side. Turn on the
Primary
and (if installed) the
Redundant
power switches.
4. (
For Synergy 2 and 2.5 Control Panels Only
) Close the control panel tub.
5. Remove the front door from the frame. Refer to the section “
” on page 3-16 for more information.
6. Locate the frame power supply power switches, which are situated on the left-hand side
of the power supplies. Turn on the primary
and, if installed, the redundant
power
switches.
7. On the control panel, ensure that the
PANEL
LED under the
POWER FAIL
heading is
not lit.
•
If it
is
lit, turn the control panel off and check all power connections.
•
Turn the unit back on and recheck the
PANEL
LED. If the LED is still lit, contact
Ross Video Technical Support.
8. On the control panel, ensure that the
FRAME
LED is not lit.
•
If it is lit, turn all power supplies off and check all power connections.
•
Turn all power supplies back on and recheck the
FRAME
LED. If the LED is still
lit, refer to Chapter 25, “
” for information on diagnosing
power supplies. If you require further assistance, contact Ross Video Technical
Support.
This completes the procedure for powering up the system.
Please note:
•
The
order
in which you power up the frame and control panel is not important — either
can be powered up first.
•
Powering up the switcher causes the system to restore the
previous condition
that existed
before power down. In the absence of a valid condition, a “reset” condition is presented,
with the
BLACK
crosspoint selected on all buses. Switcher memory contents are
retained.
Summary of Contents for Synergy MD
Page 1: ...Ross Video Limited Synergy Q MD Engineering Manual Volume I Software Issue 9 1 MD ...
Page 10: ......
Page 18: ...viii Contents Synergy Q MD Engineering Manual v9 1 MD ...
Page 46: ...1 28 Introduction Synergy Q MD Engineering Manual v9 1 MD ...
Page 204: ...7 34 BNC Configuration and Check Synergy Q MD Engineering Manual v9 1 MD ...
Page 302: ...10 56 Custom Controls Synergy Q MD Engineering Manual v9 1 MD ...
Page 366: ...13 16 SmartConversion Synergy Q MD Engineering Manual v9 1 MD ...
Page 370: ...GL 4 Glossary of Terms Synergy Q MD Engineering Manual v9 1 MD ...