3–12 • Physical Installation
Synergy Q/MD Engineering Manual (v9.1 MD)
Synergy 2 Control Panel Cutout Dimensions
Synergy 3 Control Panel Cutout Dimensions
2. In addition to the cut-out measurement, ensure that there is sufficient clearance
under
the desktop
for connectors and cables on the rear of the control panel. Approximately
four inches (10.1 cm) of clearance should be sufficient for each switcher, as shown
below.
Operating
Tip
When measuring for the cutout, it is recommended that you place the
front lip
of the panel within two inches (5.0 cm) of the console front (as
shown in the diagrams above). This placement is designed for the
convenience of the operator.
35.5" (90.2 cm)
Console Top
21.25"
(54.0 cm)
Console Front
Cable Clearance
4.0" (10.1 cm)
Cutout - Synergy 2
Distance from Cutout
to Console Front
(Recommended)
2.0" (5.0 cm)
Distance
from Cutout
to Console Front
(Recommended)
2.0" (5.0 cm)
50.25" (127.6 cm)
Console Front
Console Top
Cable Clearance
4.0" (10.1 cm)
23.0"
(58.4 cm)
Cutout - Synergy 3
Summary of Contents for Synergy MD
Page 1: ...Ross Video Limited Synergy Q MD Engineering Manual Volume I Software Issue 9 1 MD ...
Page 10: ......
Page 18: ...viii Contents Synergy Q MD Engineering Manual v9 1 MD ...
Page 46: ...1 28 Introduction Synergy Q MD Engineering Manual v9 1 MD ...
Page 204: ...7 34 BNC Configuration and Check Synergy Q MD Engineering Manual v9 1 MD ...
Page 302: ...10 56 Custom Controls Synergy Q MD Engineering Manual v9 1 MD ...
Page 366: ...13 16 SmartConversion Synergy Q MD Engineering Manual v9 1 MD ...
Page 370: ...GL 4 Glossary of Terms Synergy Q MD Engineering Manual v9 1 MD ...