
Synergy Q/MD Engineering Manual (v9.1 MD)
Physical Installation • 3–15
Rear of Synergy Q/MD Frame with Support Brackets Installed
4. Install the frame into the rack, as desired, and secure the support brackets to the rack
rails.
5. Re-install the frame door.
This completes the procedure for securing the support brackets to the frame.
Please note:
•
The system is shipped with the door on.
•
The system is shipped with all circuit boards, the requested quantity of input and output
boards, and the power supply already installed. If you have reason to remove or install
additional printed circuit boards, refer to the section “
” on page 3-19. Most boards are hot-swappable, and the circuit board extractors
on the sides of the boards allow easy installation and removal.
•
As a precaution after installation, ensure that all boards are tightly pushed into their
midplane connectors.
•
Some of the daughter boards may have come loose during shipping. Check, and if
necessary reseat, Squeeze & Tease Channel, WARP, DSP, and XFX cards. refer to the
section “
Removing/Installing Circuit Boards
” on page 3-19 and Chapter 27, “
” for information on removing and installing circuit boards.
Rear Mounting
Flange
Support
Bracket
Rack
Summary of Contents for Synergy MD
Page 1: ...Ross Video Limited Synergy Q MD Engineering Manual Volume I Software Issue 9 1 MD ...
Page 10: ......
Page 18: ...viii Contents Synergy Q MD Engineering Manual v9 1 MD ...
Page 46: ...1 28 Introduction Synergy Q MD Engineering Manual v9 1 MD ...
Page 204: ...7 34 BNC Configuration and Check Synergy Q MD Engineering Manual v9 1 MD ...
Page 302: ...10 56 Custom Controls Synergy Q MD Engineering Manual v9 1 MD ...
Page 366: ...13 16 SmartConversion Synergy Q MD Engineering Manual v9 1 MD ...
Page 370: ...GL 4 Glossary of Terms Synergy Q MD Engineering Manual v9 1 MD ...