3 Replacement of Main Parts
3-38
3
Tighten the ADJUSTMENT SCREW and remove the slack in
the Wire.
Do not tighten it too tightly.
15
Fix the CARRIAGE WIRE to the TOOL CARRIAGE.
14
Rotate the DRIVE PULLEY until the CARRIAGE WIRE
comes to its second wind from the top.
16
13
Fix the SPRING, then tighten up the 2 screws to fix the
FLANGE with checking the gears mesh without backlash.
SPRING
FLANGE
ADJUSTMENT SCREW
Make sure that the Tool Carriage is connected
to the Printing Carriage, and also Printing
Carriage is locked when fixing the WIRE.
SCREW
SCREW
WIRE
WASHER
Summary of Contents for SP-300
Page 128: ...2 Electrical Section 2 2 2 2 2 MAIN BOARD DIP SW DIP SW bit 1 bit 8 Always OFF ...
Page 134: ...2 Electrical Section 2 8 2 2 3 SERVO BOARD ...
Page 135: ...2 Electrical Section 2 9 2 ...
Page 140: ...2 Electrical Section 2 14 2 2 4 HEATER BOARD ...
Page 189: ...3 Replacement of Main Parts 3 42 3 9 Carry out the LINEAR ENCODER SETUP ...