3 Replacement of Main Parts
3-29
3
5
6
7
8
Remove CARRIAGE COVER, INK CARTRIDGE COVER
and TOP COVER. Then, move the HEAD CARRIAGE to
the left end.
Disconnect the INK TUBEs from the INK DAMPERs
and put the scotch tape at the tip of the ink tubes to
prevent the ink from spilling out.
D i s c o n n e c t t h e I N K T U B E s f r o m t h e I N K
CARTRIDGE HOLDER and put the scotch tape at the
tip of the ink tubes to prevent the ink from coming out.
CARRIAGE COVER
Remove LEFT COVER, I/S COVER, FRONT RAIL COVER
and FRONT COVER.
FRONT RAIL COVER
FRONT COVER
I/S COVER
LEFT COVER
TOP COVER
INK CARTRIDGE COVER
INK TUBE
Summary of Contents for SP-300
Page 128: ...2 Electrical Section 2 2 2 2 2 MAIN BOARD DIP SW DIP SW bit 1 bit 8 Always OFF ...
Page 134: ...2 Electrical Section 2 8 2 2 3 SERVO BOARD ...
Page 135: ...2 Electrical Section 2 9 2 ...
Page 140: ...2 Electrical Section 2 14 2 2 4 HEATER BOARD ...
Page 189: ...3 Replacement of Main Parts 3 42 3 9 Carry out the LINEAR ENCODER SETUP ...