3.
Make sure that the arms
¶
of the auxiliary tray fit tightly over the ridges
·
of the proof tray
below.
Shift Auxiliary Tray
1.
Open and close the front door of the finisher.
2.
This initializes the finisher and moves the shift tray to the standby position.
3.
Open the front door again and leave it open.
4.
Set the shift auxiliary tray [A] on the shift tray as shown.
5.
Close the front door.
6.
This initializes the finisher again and moves the shift tray to the new standby position with
the auxiliary tray installed.
7.
After the job is finished, remove the tray and store it in the auxiliary tray storage pocket on
the back of the finisher.
2000-Sheet Finisher (B700)
87
1
Summary of Contents for G148
Page 1: ...Model MT P2 Machine Code G148 SERVICE MANUAL 23 June 2006 Subject to change...
Page 52: ...10 Clamp 1 LCT B473 51 1...
Page 94: ...16 Set the hopper 13 in its holder Punch Unit B702 93 1...
Page 129: ...2 Preventive Maintenance 128 2...
Page 163: ...1 Open the front door 2 Pull out the internal dust filter A 3 Replacement and Adjustment 162 3...
Page 172: ...4 Development motor bracket D x 3 x 1 5 Development motor E x 4 Development Unit 171 3...
Page 237: ...3 Replacement and Adjustment 236 3...
Page 295: ...Install the paper feed unit 4 Troubleshooting 294 4...
Page 435: ...5 Service Tables 434 5...
Page 521: ...6 Details 520 6...