1.
Pressure arm [A]
• Insert the tips of two screwdrivers and press down to release.
2.
C-clamps [B] (both ends)
3.
Drive gear [C]
4.
Bushings (both ends) [D]
5.
Bearings [E]
6.
Hot roller [F]
7.
Entrance guide plate [A] (
x 2)
8.
Pressure roller [B] (
x 2)
• The pressure roller and pressure roller bearing should always be replaced together.
3. Replacement and Adjustment
188
3
Summary of Contents for G148
Page 1: ...Model MT P2 Machine Code G148 SERVICE MANUAL 23 June 2006 Subject to change...
Page 52: ...10 Clamp 1 LCT B473 51 1...
Page 94: ...16 Set the hopper 13 in its holder Punch Unit B702 93 1...
Page 129: ...2 Preventive Maintenance 128 2...
Page 163: ...1 Open the front door 2 Pull out the internal dust filter A 3 Replacement and Adjustment 162 3...
Page 172: ...4 Development motor bracket D x 3 x 1 5 Development motor E x 4 Development Unit 171 3...
Page 237: ...3 Replacement and Adjustment 236 3...
Page 295: ...Install the paper feed unit 4 Troubleshooting 294 4...
Page 435: ...5 Service Tables 434 5...
Page 521: ...6 Details 520 6...