3.
Release the drive roller [E] (
x 2).
4.
Press in on the drive roller to collapse the unit into a “U” shape [F].
5.
Remove the belt and replace it.
Re-installation
• Before re-assembling the transfer belt unit, use a clean cloth and alcohol to clean the contact points
of the drive roller, idle roller, and transfer roller. Make sure these areas are clean and free from
toner, paper dust, etc.
• Never touch the surface of the belt with bare hands and never apply alcohol to the surface of the
belt. Clean it with a blower brush. Check the underside of the transfer belt and clean with the blower
brush.
• When re-assembling the transfer belt unit, make sure that the transfer belt is centered between the
triangular marks [A] on either side of the unit.
• After re-assembly, make sure that the transfer belt is inside the transfer current terminal. The belt
could be cut if it is not positioned correctly.
• Confirm that both the ground and transfer current terminal are connected and that the harnesses
are not touching the release lever.
3. Replacement and Adjustment
174
3
Summary of Contents for G148
Page 1: ...Model MT P2 Machine Code G148 SERVICE MANUAL 23 June 2006 Subject to change...
Page 52: ...10 Clamp 1 LCT B473 51 1...
Page 94: ...16 Set the hopper 13 in its holder Punch Unit B702 93 1...
Page 129: ...2 Preventive Maintenance 128 2...
Page 163: ...1 Open the front door 2 Pull out the internal dust filter A 3 Replacement and Adjustment 162 3...
Page 172: ...4 Development motor bracket D x 3 x 1 5 Development motor E x 4 Development Unit 171 3...
Page 237: ...3 Replacement and Adjustment 236 3...
Page 295: ...Install the paper feed unit 4 Troubleshooting 294 4...
Page 435: ...5 Service Tables 434 5...
Page 521: ...6 Details 520 6...