2. Preventive Maintenance
PM Tables
The amounts mentioned (K=1,000) as the PM interval indicate the number of prints or copies unless stated
otherwise. These numbers are based on the PM counter.
Symbol key: C: Clean, R: Replace, L: Lubricate, I: Inspect, EM: Emergency Maintenance
• Turn off the power switch and unplug the power cord before performing any procedure in this section.
Laser beams can seriously damage the eyes.
Main Machine
300K 450K 600K
Exp. K
Note
AROUND THE DRUM
Charge Corona Grid
R
R
450
Blower brush.
Charge Corona Wire
R
C
R
450
Alcohol, or clean damp cloth.
Charge Wire Cleaning Pad
R
R
450
Cleaning Blade
R
R
500
Cleaning Brush
R
R
500
Charge Corona Casing
C
C
Alcohol, or clean damp cloth.
Internal Dust Filter
C
C
C
Blower brush.
ID Sensor
C
C
C
Blower brush. Do SP 3001 002 after
cleaning.
Pick-off Pawls
I
I
Replace if necessary.
Potential Sensor
C
C
C
Blower brush.
OPC Drum
1,200 Replace at
Quenching Lamp
C
C
C
Transfer Entrance Stay
C
C
C
Dry cloth.
121
2
Summary of Contents for G148
Page 1: ...Model MT P2 Machine Code G148 SERVICE MANUAL 23 June 2006 Subject to change...
Page 52: ...10 Clamp 1 LCT B473 51 1...
Page 94: ...16 Set the hopper 13 in its holder Punch Unit B702 93 1...
Page 129: ...2 Preventive Maintenance 128 2...
Page 163: ...1 Open the front door 2 Pull out the internal dust filter A 3 Replacement and Adjustment 162 3...
Page 172: ...4 Development motor bracket D x 3 x 1 5 Development motor E x 4 Development Unit 171 3...
Page 237: ...3 Replacement and Adjustment 236 3...
Page 295: ...Install the paper feed unit 4 Troubleshooting 294 4...
Page 435: ...5 Service Tables 434 5...
Page 521: ...6 Details 520 6...