160
D
OMINION
SX
U
SER
G
UIDE
Associations Power Control
Click
Associations Power Control
on the
Power Control
menu to access the tool to manage
power control associations.
Figure 97 Associations Power Control
Note: When executing power on/off operation, about ~5 seconds are added to the
configured sequential interval, resulting in an operational delay time (minimum amount of
time to operate). If power cycle is selected, all associated outlets will be powered off
sequentially, and then powered on sequentially. The cycle delay time reacted here
determines the minimum length of time needed to turn back on the outlets after they’re
shut down, which is user-specified by administrator. The delay time to experience would be
operational delay + user-specified delay.
Summary of Contents for DOMINION SX -
Page 2: ...This page intentionally left blank...
Page 18: ...This page intentionally left blank...
Page 22: ...4 DOMINION SX USER GUIDE This page intentionally left blank...
Page 44: ...26 DOMINION SX USER GUIDE...
Page 48: ...30 DOMINION SX USER GUIDE...
Page 83: ...CHAPTER 8 SECURITY 65 Figure 59 SSL Client Certificate Screen...
Page 104: ...86 DOMINION SX USER GUIDE...
Page 170: ...152 DOMINION SX USER GUIDE...
Page 174: ...156 DOMINION SX USER GUIDE...
Page 196: ...178 DOMINION SX USER GUIDE Install the Dominion SX Server Certificate section that follows...
Page 203: ...APPENDIX C CERTIFICATES 185...
Page 204: ...186 DOMINION SX USER GUIDE...
Page 212: ...194 DOMINION SX USER GUIDE...
Page 225: ...APPENDIX F TROUBLESHOOTING 207 255 60 2000 00...