
SV63136 Rev. A
5-7
Troubleshooting • 5
Resuming the
Job
To resume running your job after a stoppage is cleared:
1. Make sure that there are no error messages on the screen and that all
system covers are closed.
2. Press START.
• If the error message on the screen instructed you to remove mate-
rial in trays to start a new collation, pressing START will begin a new
collation,
otherwise
• The job will resume counting from the last complete mail piece that it
produced.
During the recovery from jams and other machine stoppages, the system
will automatically clear material from the transport deck that cannot be
completed by the inserter.
The system counts all mail pieces that it has successfully completed (trial
pieces included), but partially assembled pieces are not counted and are
transported to the upper divert area. The user has two options The system
handles outsorts in these ways:
• Discard the items.
• Manually assemble the piece.
Handling
Outsorted
Material
Summary of Contents for Relay 5000
Page 8: ...This page is intentionally blank ...
Page 10: ...This page is intentionally blank ...
Page 12: ...SV63136 Rev A This page is intentionally blank ...
Page 18: ...This page is intentionally blank ...
Page 20: ...This page is intentionally blank ...
Page 44: ...This page is intentionally blank ...
Page 46: ...This page is intentionally blank ...
Page 92: ...This page is intentionally blank ...
Page 98: ...This page is intentionally blank ...
Page 118: ...SV63136 Rev A This page is intentionally blank ...
Page 120: ...SV63136 Rev A This page is intentionally blank ...
Page 132: ...This page is intentionally blank ...
Page 134: ...This page is intensionally blank ...
Page 148: ...This page is intentionally blank ...
Page 194: ...This page is intentionally blank ...
Page 201: ......