![Nortel CallPilot 1001rp Installation And Configuration Manual Download Page 324](http://html1.mh-extra.com/html/nortel/callpilot-1001rp/callpilot-1001rp_installation-and-configuration-manual_1707126324.webp)
Maintaining the Pentium II SBC card
Standard 1.0
324
CallPilot
16
Slide the media drive chassis gently into the media bay.
Leave enough space to reconnect the power and I/O cables for the IDE
floppy disk drive, CD-ROM drive, and tape drive.
17
Reconnect the power and I/O cables for the IDE floppy disk drive, CD-
ROM drive, and tape drive.
18
Slide the media drive chassis completely in, and screw it into place.
19
Ensure that DIMM(s) have been installed on the SBC.
20
Identify the Switch Block (SW1) location on the SBC with the help of the
picture that follows on page 325. The Switch Block contains four DIP
switches (1-4) that you configure affecting on-board ROM access, CMOS
RAM, and configuration ports.
a.
Ensure DIP switch number 1 is set to the closed/on position.
ATTENTION
Ensure that PIN 1 on the I/O cable is in the correct
position. PIN 1 on the cable is marked with a colored
stripe. PIN 1 on the drive connector is marked with a
small square or triangle. The cable is generally keyed.
.
DANGER
Risk of explosion
The SBC has a lithium battery installed. If you are discarding
the SBC, dispose of used batteries according to the
manufacturer’s instructions.
.
CAUTION
Risk of equipment damage
Do not install memory modules (DIMMs) from a Pentium II SBC
on a Pentium III SBC.
Summary of Contents for CallPilot 1001rp
Page 2: ...P0949455...
Page 6: ...vi CallPilot Publication history Standard 1 0...
Page 38: ...Troubleshooting your CallPilot system Standard 1 0 38 CallPilot...
Page 62: ...Using Windows NT online diagnostic tools Standard 1 0 62 CallPilot...
Page 74: ...Using serial port diagnostic tools Standard 1 0 74 CallPilot...
Page 88: ...Using CallPilot Manager to monitor hardware Standard 1 0 88 CallPilot...
Page 114: ...Using CallPilot Manager to monitor hardware Standard 1 0 114 CallPilot...
Page 150: ...Replacing basic chassis components Standard 1 0 150 CallPilot...
Page 168: ...Replacing a hard drive tape drive CD ROM drive or floppy drive Standard 1 0 168 CallPilot...
Page 178: ...Performing RAID maintenance Standard 1 0 178 CallPilot...
Page 260: ...Performing RAID maintenance Standard 1 0 260 CallPilot...
Page 274: ...Replacing or adding voice processing boards Standard 1 0 274 CallPilot...
Page 280: ...Replacing the video card Standard 1 0 280 CallPilot...
Page 292: ...Replacing the network cards Standard 1 0 292 CallPilot...
Page 320: ...Maintaining the Pentium II SBC card Standard 1 0 320 CallPilot Pentium II SBC...
Page 348: ...Maintaining the Pentium III SBC card Standard 1 0 348 CallPilot...
Page 367: ......