RP0200-2000
ii
NACE International
_______________________________________________________________________
NACE International
Standard
Recommended Practice
Steel-Cased Pipeline Practices
Contents
1. General..................................................................................................................... 1
2. Definitions................................................................................................................. 1
3. Design ...................................................................................................................... 1
4. Installation ................................................................................................................ 2
5. Maintenance and Repair ........................................................................................... 4
6. Monitoring................................................................................................................. 5
References..................................................................................................................... 6
Bibliography ................................................................................................................... 6
Appendix A: Typical Casing-Filling Procedures.............................................................. 7
Appendix B: Monitoring Techniques .............................................................................. 8
Figures:
Figure B1: Potential Survey Measurement .................................................................... 8
Figure B2: Internal Resistance Test ............................................................................... 9
Figure B3: Four-Wire IR Drop Test (Calibrating the Inside Terminals) ......................... 12
Figure B4: Establishing a Circuit for a Four-Wire IR Drop Test (U/S End).................... 12
Figure B5: Four-Wire IR Drop Test (Establishing the Circuit) (D/S End)...................... 13
_______________________________________________________________________
Summary of Contents for CP 1
Page 1: ...CP 1 Cathodic Protection Tester Course Manual February 2005 NACE International 2000 ...
Page 265: ......
Page 266: ......
Page 267: ......
Page 268: ......
Page 301: ...RP0169 2002 32 NACE International ISBN 1 57590 035 1 ...
Page 535: ...TM0101 2001 24 NACE International ISBN 1 57590 137 4 ...