10 Transporting transformer to the operating site
Maschinenfabrik Reinhausen GmbH 2015
215
4349315/00 EN
VACUTAP® VR®
To do so, proceed as follows:
► Establish the connecting lead on the on-load tap-changer head between
connections E2 and Q or E2 and R.
Figure 288: Connecting lead
In case of a short-term immobilization time of maximum 4 weeks without an
oil conservator, dropping the oil level in the on-load tap-changer head by
about 5 liters is also sufficient.
Transport without oil fill
1.
NOTICE!
Completely empty the oil compartment of the on-load tap-
changer if the transformer is completely emptied of oil.If this is not done,
the oil compartment may be damaged.
2.
Preserve the interior of the oil compartment in the same way as the
transformer (for example by filling with N2).
For longer immobilization periods, you must connect and operate the motor-
drive unit heating.
For downtimes prior to commissioning of more than 8 weeks and operation
interruptions more than 2 weeks, you must connect and operate the heating
to avoid condensation water in the interior of the protective housing.
10.3
Summary of Contents for VACUTAP VR
Page 1: ...On Load Tap Changer VACUTAP VR Installation and Commissioning Instructions 4349315 00 EN ...
Page 246: ...14 Appendix Maschinenfabrik Reinhausen GmbH 2015 246 4349315 00 EN VACUTAP VR ...
Page 248: ...14 Appendix Maschinenfabrik Reinhausen GmbH 2015 248 4349315 00 EN VACUTAP VR ...
Page 266: ......
Page 267: ......