5 Assembly: Standard design
Maschinenfabrik Reinhausen GmbH 2015
72
4349315/00 EN
VACUTAP® VR®
Removing tap-change supervisory control (if present)
NOTICE
Damage to the on-load tap-changer and transformer!
Removing the tap-change supervisory control without due care may dam-
age it, thereby resulting in damage to the on-load tap-changer and trans-
former!
► Remove tap-change supervisory control with care in order not to dam-
age or rip out the connecting leads.
1.
Take tap-change supervisory control plug connector out of bracket and
disconnect.
Figure 61: Plug connector
2.
Remove nuts and locking elements (3 or 4 depending on model) on the
mounting plate.
Figure 62: Mounting plate
5.7.2.1.5
Summary of Contents for VACUTAP VR
Page 1: ...On Load Tap Changer VACUTAP VR Installation and Commissioning Instructions 4349315 00 EN ...
Page 246: ...14 Appendix Maschinenfabrik Reinhausen GmbH 2015 246 4349315 00 EN VACUTAP VR ...
Page 248: ...14 Appendix Maschinenfabrik Reinhausen GmbH 2015 248 4349315 00 EN VACUTAP VR ...
Page 266: ......
Page 267: ......