6 Assembly: Bell-type tank design
Maschinenfabrik Reinhausen GmbH 2015
137
4349315/00 EN
VACUTAP® VR®
Vacuum-drying in the transformer tank
Before you start vacuum-drying in the transformer tank, you must place a
connecting lead between the corresponding pipe connections and seal off
the pipe connections not being used with blank covers.
The on-load tap-changer head cover remains closed during the entire drying
process.
1.
Establish a connecting lead either between the connections E2 and Q or
connections E2 and R on the on-load tap-changer head.
Figure 171: Connecting lead
2.
Seal off unused pipe connections with a suitable blank cover.
Vacuum-drying in the transformer tank
1.
Heat up the on-load tap-changer in air at atmospheric pressure with a
temperature increase of about 10 °C/h to a final temperature of maxi-
mum 110 °C.
2.
Pre-dry the on-load tap-changer in circulating air at a max. temperature
of 110 °C for a period of 20 hours.
3.
Vacuum dry on-load tap-changer at between 105 °C and maximum 125
°C for at least 50 hours.
4.
Residual pressure of no more than 10
-3
bar.
Vapor-phase drying in the transformer tank
For vapor-phase drying in the transformer tank, you have to open the kero-
sene drain plug before drying so that the kerosene condensate can drain
from the oil compartment.
6.9.1
6.9.2
Summary of Contents for VACUTAP VR
Page 1: ...On Load Tap Changer VACUTAP VR Installation and Commissioning Instructions 4349315 00 EN ...
Page 246: ...14 Appendix Maschinenfabrik Reinhausen GmbH 2015 246 4349315 00 EN VACUTAP VR ...
Page 248: ...14 Appendix Maschinenfabrik Reinhausen GmbH 2015 248 4349315 00 EN VACUTAP VR ...
Page 266: ......
Page 267: ......