11 Commissioning transformer at installation site
Maschinenfabrik Reinhausen GmbH 2015
220
4349315/00 EN
VACUTAP® VR®
NOTICE
Damage to the on-load tap-changer!
Damage to the on-load tap-changer by actuating the on-load tap-changer
without oil!
► Before actuating the on-load tap-changer for the first time, the tap se-
lector must be completely immersed in transformer oil and the oil com-
partment completely filled with oil.
► The on-load tap-changer can be operated in the temperature range of
the surrounding transformer oil of between -25 ° and +105 °C and with
overload up to +115 °C in accordance with IEC 60214-1.
1.
Establish a connecting lead between the pipe connection E2 and one of
the pipe connections R, S or Q to ensure equal pressure during evacua-
tion in the oil compartment and transformer.
Figure 289: Connecting lead between E2 and Q.
Summary of Contents for VACUTAP VR
Page 1: ...On Load Tap Changer VACUTAP VR Installation and Commissioning Instructions 4349315 00 EN ...
Page 246: ...14 Appendix Maschinenfabrik Reinhausen GmbH 2015 246 4349315 00 EN VACUTAP VR ...
Page 248: ...14 Appendix Maschinenfabrik Reinhausen GmbH 2015 248 4349315 00 EN VACUTAP VR ...
Page 266: ......
Page 267: ......