5 Assembly: Standard design
Maschinenfabrik Reinhausen GmbH 2015
49
4349315/00 EN
VACUTAP® VR®
5.
Remove the ring nuts from the selector.
Figure 29: Ring nut
6.
NOTICE!
Carefully lift selector below the oil compartment ensuring that
the selector take-off leads are free and do not touch the oil compart-
ment. If this is not done, the selector take-off leads may be damaged.
7.
Align the position of both coupling parts and attachment points on the oil
compartment and the selector with one another. The correct position of
the two coupling parts is shown in the adjustment plans in the appendix.
8.
Screw selector onto oil compartment.
Figure 30: Selector with oil compartment
9.
Remove the wooden support on the underside of the change-over se-
lector.
Summary of Contents for VACUTAP VR
Page 1: ...On Load Tap Changer VACUTAP VR Installation and Commissioning Instructions 4349315 00 EN ...
Page 246: ...14 Appendix Maschinenfabrik Reinhausen GmbH 2015 246 4349315 00 EN VACUTAP VR ...
Page 248: ...14 Appendix Maschinenfabrik Reinhausen GmbH 2015 248 4349315 00 EN VACUTAP VR ...
Page 266: ......
Page 267: ......