6 Assembly: Bell-type tank design
Maschinenfabrik Reinhausen GmbH 2015
109
4349315/00 EN
VACUTAP® VR®
Parallel bridges for VRG I 1601
Bridges for connecting the connection contacts of the fine tap selector and
change-over selector in parallel in accordance with drawing 786920 [
will be supplied.
Connecting on-load tap-changer take-off lead
There are through-holes 13 mm in diameter at three points on the oil com-
partment's connecting ring.
1.
Connect the on-load tap-changer take-off lead to the connecting ring of
the oil compartment.
2.
Secure screw connection.
Figure 125: On-load tap-changer take-off lead
Carrying out the transformer ratio test
We recommend carrying out a transformer ratio test before the transformer
is dried. The following types of transformer ratio test are possible:
▪
Transformer ratio test with TAPMOTION® TD test drive
▪
Manual transformer ratio test
6.3.10
6.3.11
6.4
Summary of Contents for VACUTAP VR
Page 1: ...On Load Tap Changer VACUTAP VR Installation and Commissioning Instructions 4349315 00 EN ...
Page 246: ...14 Appendix Maschinenfabrik Reinhausen GmbH 2015 246 4349315 00 EN VACUTAP VR ...
Page 248: ...14 Appendix Maschinenfabrik Reinhausen GmbH 2015 248 4349315 00 EN VACUTAP VR ...
Page 266: ......
Page 267: ......