Installation
2-70 Manual # 42-02-2P24
Tape End Pieces
Tape end clamps are loosely assembled using 1-inch, 8x32 screws so
that you can simply loosen them up, weave the tape through, and tighten the screws down. It
may be easiest to attach just the top end piece now and then attach the bottom end piece after
hanging the tape.
1. Loosen the screws on a tape end clamp. Slide the tape through between the center piece
and the top clamp, magnetic band up, down through the square hole and back through
between the center piece and the bottom clamp. See the figure below.
2. Gently tighten the screws in the order shown below. Square up the end clamp and the
tape.
3. In the same 1, 2, 3, 4 order, make several passes, tightening each screw just a little each
time. Finally, torque each screw to 14 in-lb. or 224 in-oz. (depending on the units on
your torque driver).
Hanging Tape
With the hangers in position on the rails such that the tape will hang
approximately vertically, connect the tape to the top hanger using the hex bolt and locking nut
provided. Make certain the arrow on the tape is pointing up and that the magnetic surface is
facing the car. Begin unreeling tape toward the bottom of the hoistway:
1. Move slowly down the hoistway and unroll the tape from the carrier.
90-degrees
1
2
3
4
Side View
Hex bolt &
lock nut
Summary of Contents for Motion 4000
Page 20: ...xiv Manual 42 02 2P24 5 20 13 ...
Page 38: ...Motion 4000 Traction Elevator Control 1 18 Manual 42 02 2P24 ...
Page 178: ...Final Adjustments 3 56 Manual 42 02 2P24 ...
Page 322: ...User Interface 4 144 Manual 42 02 2P24 ...
Page 391: ...PC Board Quick References 5 69 5 Motion 4000 Figure 5 11 Example MC CPI Wiring ...
Page 439: ...Customer Notations A 27 A Motion 4000 Customer Notations Table A 4 Customer Notation Area ...
Page 444: ...Appendix A 32 Manual 42 02 2P24 ...