126
●
While CH
External preset/replace (Z Phase) request detection (RX23, RX3B) is on, the value cannot be replaced by
any methods. Replace the value after turning off CH
External preset/replace (Z Phase) request detection (RX23,
RX3B) by turning on CH
External preset/replace (Z Phase) request detection reset command (RY23, RY3B).
●
Have a
Δ
T
1
or longer interval after changing CH
Preset value setting (RWw14 to RWw15, RWw2C to RWw2D) until
CH
Phase Z input terminal (Z1, Z2) is turned on because there are maximum of
Δ
T
1
delay until change in CH
Preset
value setting (RWw14 to RWw15, RWw2C to RWw2D) is reflected. An interval is not necessary when the preset/replace
function is performed by the preset/replace command since there is a delay of when the preset/replace command is
used.
*1
●
When the preset/replace function is performed by CH
Phase Z input terminal (Z1, Z2), the operation response time
follows CH
Z phase input response time setting (address: 0129
H
.b0 to b1, 0149
H
.b0 to b1). Since CH
Present value
(RWr10 to RWr11, RWr28 to RWr29) is updated synchronizing with the internal control cycle, a maximum of delay time
shown below occurs until the preset value is stored.
•
Δ
T
1
*1
+ Setting time of CH
Z phase input response time setting (address: 0129
H
.b0 to b1, 0149
H
.b0 to b1)
*1
For
Δ
T
1
, refer to Page 283, Appendix 4.
Summary of Contents for NZ2GFCF-D62PD2
Page 1: ......
Page 2: ......
Page 54: ...52 Memo ...
Page 206: ...204 Memo ...
Page 303: ......
Page 304: ......