![Mitsubishi GOT2000Series Connection Manual Download Page 328](http://html1.mh-extra.com/html/mitsubishi/got2000series/got2000series_connection-manual_1809187328.webp)
14 - 14
14. CONNECTION TO SIEMENS PLC
14.3 Ethernet Connection
(2) Ethernet connection type: OP communication
(a) S7-200
Set the following parameters.
(b) S7-300/400
Set the following parameters.
• When using the Ethernet module
• When using the built-in Ethernet port
(c) S7-1200
Set the following parameters.
14.3.5
Precautions
When connecting to multiple GOTs
(1) Setting Station
When connecting two or more GOTs in the Ethernet
network, set each [Station] to the GOT.
(2) Setting IP address
Do not use the IP address "192.168.0.18" when using
multiple GOTs.
A communication error may occur on the GOT with the
IP address.
When setting IP address
Do not use "0" and "255" at the end of an IP address.
(Numbers of *.*.*.0 and *.*.*.255 are used by the
system.)
The GOT may not monitor the controller correctly with
the above numbers.
Consult with the administrator of the network before
setting an IP address to the GOT and controller.
When connecting to the multiple network
equipment (including GOT) in a segment
By increasing the network load, the transmission speed
between the GOT and PLC may be reduced.
The following actions may improve the communication
performance.
• Using a switching hub
• More high speed by 100BASE-TX (100Mbps)
• Reduction of the monitoring points on GOT
When monitoring a nonexistent or turned-off
station
If a time-out occurs with the initial communication by
monitoring a nonexistent or turned-off station, the time-
out can delay the communication with the normally
operating station.
Timing to start GOT communication
After the PLC starts up, start the GOT communication.
When the GOT starts communication before the PLC
starts up, a communication timeout occurs.
Operations during communication
During normal communication, any operation which
makes the GOT restart (including writing a project and
changing utility data)may display the system alarm,
"402 Communication timeout. Confirm communication
pathway or modules.", when the GOT restarts.
Item
Setting details
Module Position
Value in [Position] of the Ethernet module
Module Address
IP Address
PLC side IP address
Subnet
mask
PLC side subnet mask
Number of
connections to
configure for this
module
Set "1" as the number of connected GOT.
This is a Server
connection: Servers
respond to connection
request from remote
clients.
Mark the check box.
Local Properties
(Server)
Select [Accept all connection requests]
Remote Properties
(Client)
Set "10.00" in [TSAP].
Enable the Keep Alive
function for this
connection.
Unmark the check box.
Item
Setting details
Properties
IP Address
PLC side IP address
Subnet
mask
PLC side subnet mask
Item
Setting details
Device name
Set [PN-IO]
Properties
IP Address
PLC side IP address
Subnet
mask
PLC side subnet mask
Item
Setting details
Ethernet addresses
IP Address
PLC side IP address
Subnet
mask
PLC side subnet mask
Summary of Contents for GOT2000Series
Page 2: ......
Page 17: ...A 15 REVISIONS WARRANTY...
Page 52: ...1 30 1 PREPARATORY PROCEDURES FOR MONITORING 1 6 Checking for Normal Monitoring...
Page 54: ......
Page 78: ...3 10 3 CONNECTION TO HITACHI PLC 3 6 Device Range that Can Be Set...
Page 100: ...4 22 4 CONNECTION TO FUJI PLC 4 7 Precautions...
Page 174: ...7 24 7 CONNECTION TO YOKOGAWA PLC 7 4 Device Range that Can Be Set...
Page 262: ...9 54 9 CONNECTION TO RKC TEMPERATURE CONTROLLER 9 7 Precautions...
Page 280: ...10 18 10 CONNECTION TO ALLEN BRADLEY PLC 10 4 Device Range that Can Be Set...
Page 296: ...11 16 11 CONNECTION TO GE PLC 11 7 Precautions...
Page 308: ...12 12 12 CONNECTION TO LS INDUSTRIAL SYSTEMS PLC 12 6 Device Range that Can Be Set...
Page 332: ...14 18 14 CONNECTION TO SIEMENS PLC 14 4 Device Range that Can Be Set...
Page 334: ...REVISIONS 2...
Page 337: ......